All-in-One Project Estimator
Multi-Layer Project & Shopping List Calculator
Real hardscaping projects have layers: excavation, geotextile fabric, compacted crusher run base, top decorative stone, and perimeter edging. Calculate your complete bill of materials in one place.
Choose a Layered Project Preset:
Project Dimensions
ft
ft
Layer Thicknesses
Layer 1: Structural Base Course
Layer 2: Top Decorative Stone
Project Supplies & Restraints
Master Project Shopping List (BOM)
480 sq ft Footprint
Field Contractor Rule of Thumb:
Always excavate to the bottom of the base course layer. Never lay your base stone on top of virgin grass or unexcavated organic topsoil. If excavating 8 inches total depth, expect the loose spoil pile to swell by 20% to 30% in volume when loading into a dump trailer.